SUMMARY OF MEETING BETWEEN HARUM INTISARI
SDN BHD (HISB) AND THE RESIDENTS’ REPRESENTATIVES FOR HOUSE
BUYERS OF PHASE 5A ON SATURDAY 21.5.05 AT 2.30PM AT THE SALES
OFFICE OF HISB, AMBANG BOTANIC, KLANG
1.
ATTENDANCE
1.1 Mr
Teng Chang Khim (Chairman-State Assemblyman)
1.2 Mr
Tan Kim Hai (House Buyer)
1.3 Mr
David Ung (House Buyer)
1.4 Dr
G Krishnaveni (House Buyer)
1.5 Mr
Tan Cheng Siong (House Buyer)
1.6 Mr
Low Wah Meng (House Buyer)
1.7 Mr
Steven Chu (CEO, HISB)
1.8 Mr
Lim Hai Chong (HISB)
1.9 Mr
Low Peng Ming (HISB)
1.10 Mr
Lim Chee Wai (HISB)
1.11 Mr
Low
1.12 Mr
Tan Hock Chai
1.13 Mr
Tan Peng Chuan
1.14 Mr Lim Kim Hock
2.
MATTERS ARISING
2.1.
CONSTRUCTION TO BE ACCORDING TO SALES BROCHURE AND SALES
AGREEMENT
2.1.1
Brick Wall complete with mild steel grille fencing to be 5’ high
as promised in sales agreement and sales brochure.
2.1.2
All side fencing to be 5’ brick wall complete with mild steel
grille as promised in sales brochure.
2.1.3
Timber strip to be as promised in sales brochure and what was
shown by HISB sales representative
2.2
CONSTRUCTION TO BE ACCORDING TO APPROVED PLANS
2.2.1 Letter box, refuse chamber, water meter and electrical
meter compartment to be constructed according to the approved
plans.
2.2.2
Size of refuse chamber pipe to follow the approved plans.
2.2.3 Size of electrical inlet wire to the main board should
be 25mm square.
2.2.4 Driveway shall have cement render.
2.2.5 Short of one backyard drainage outlet and the design is
different from approved plan. The pipe lay to be 6” diametre
class D PVC pipe.
2.2.6 CT point location is wrong.
2.2.7 Manhole is undersize. Manhole to be empty (without
stagnant water) at all times.
2.3.8 Every 4 course bricks to be laid with “EXMET”.
2.3.9 Roofing rafter to follow specifications, ceiling
support (use 2” x 2” wood only), ceiling manhole is undersize.
2.2.10 To make good water pipes running
above electrical lines.
2.2.11 Party wall to be built according to by-laws.
2.2.12 Rain gutters to be installed according to approved
plans and by-laws.
2.2.13 Air well to be built according to by-laws.
2.2.14 To lay electrical wire in conduit properly.
2.2.15 To change the fan hook because of improper installation
and design.
2.3
Environmental matters
2.3.1
Flooding and ponding of rain water along roads in some phases of
Bandar Botanic.
2.3.2
Drainage system to use concrete drains and not plastic pipes to
avoid maintenance problems.
2.3.3
HISB to provide schedule for and method of maintenance of the
lake.
2.3.4
HISB to ensure the cleanliness of the lake to reach the standard
of the present lake in Ambang Botanic.
3.
DISCUSSIONS
3.1
Residents' representatives
3.1.1 To rectify the matters according to the representations
made in the sales brochure, the sales agreement, the approved
plans and by-laws.
3.1.2 To consider compensation as an alternative solution to
settling the matters.
3.1.3 To consider buying back the houses from purchasers at
the sale agreement price.
3.2 HISB
3.2.1 Agreed to look into the matters arising from sales
agreement and approved plans.
3.2.2 Agreed to give a list of items which HISB is willing to
rectify immediately and to ask for purchasers’ consent to make
good the defects.
3.2.3 Agreed to arrange for meeting between consultants and
committee members to discuss matters pertaining to by-laws.
3.2.4 Not agreeable to compensation as an alternative
solution to the matters.
3.2.5 Not HISB’s practice to buy back houses from purchasers.
4.
CONCLUSION
4.1
The meeting ended at 5.00pm.
4.2
The next meeting between HISB’s consultants and the committee
members will be held at HISB sales office at 2.30pm on Saturday,
28.5.05.
|